Items where Author is "Heravi, G"
Article
Ojghaz, A S and Heravi, G (2026) An integrated BIM-GIS framework for building quality assessment based on price estimation: Evaluating design and location factors. Journal of Construction Engineering and Management, 152(4): 04026020, ISSN 0733-9364
Heydari, M; Heravi, G; Raeisinafchi, R and Karimi, H (2024) A dynamic model to assess the role of site supervision systems in the safety performance of construction projects. Journal of Construction Engineering and Management, 150(3): 04024001, ISSN 0733-9364
Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988
Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(2), pp. 643-668. ISSN 0969-9988
Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X
Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988
Heravi, G and Mohammadian, M (2021) Investigating cost overruns and delay in urban construction projects in Iran. International Journal of Construction Management, 21(9), pp. 958-968. ISSN 1562-3599
Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(8), pp. 1777-1800. ISSN 0969-9988
Esmaeeli, A N and Heravi, G (2019) Real options approach versus conventional approaches to valuing highway projects under uncertainty. Journal of Construction Engineering and Management, 145(11): 04019068, ISSN 0733-9364
Farshchian, M M and Heravi, G (2018) Probabilistic assessment of cost, time, and revenue in a portfolio of projects using stochastic agent-based simulation. Journal of Construction Engineering and Management, 144(5): 4018028, ISSN 0733-9364
Charkhakan, M H and Heravi, G (2018) Risk manageability assessment to improve risk response plan: Case study of construction projects in Iran. Journal of Construction Engineering and Management, 144(11): 05018012, ISSN 0733-9364
Farshchian, M M; Heravi, G and Abourizk, S (2017) Optimizing the owner's scenarios for budget allocation in a portfolio of projects using agent-based simulation. Journal of Construction Engineering and Management, 143(7): 04017022, ISSN 0733-9364
Heravi, G and Eslamdoost, E (2015) Applying artificial neural networks for measuring and predicting construction-labor productivity. Journal of Construction Engineering and Management, 141(10): 04015032, ISSN 0733-9364
Heravi, G and Jafari, A (2014) Cost of quality evaluation in mass-housing projects in developing countries. Journal of Construction Engineering and Management, 140(5): 04014004, ISSN 0733-9364
Heravi, G and Ilbeigi, M (2012) Development of a comprehensive model for construction project success evaluation by contractors. Engineering, Construction and Architectural Management, 19(5), pp. 526-542. ISSN 0969-9988
Up a level