Items where Author is "Hastak, M"

Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 36.

Article

Edirisinghe, R; Jayasuriya, S; Almulla, J; Abobakr, M; Bastos Costa, D; Alberte, E; Hastak, M and Tzortzopoulos, P (2025) Gender diversity in construction: Demystifying the pipeline leaks in Australia, United States, United Kingdom and Brazil. International Journal of Construction Management, 25(9), pp. 1100-1114. ISSN 1562-3599

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2023) Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects. Journal of Construction Engineering and Management, 148(7): 04022055, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) The impact of offsite construction on the workforce: Required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7): 04022056, ISSN 0733-9364

Mahdavi, A; Naderpajouh, N; Choi, J; Ketabi, A B; Hastak, M and Cui, Q (2021) Dynamics of project selection and growth in project-based organizations. International Journal of Construction Management, 21(12), pp. 1200-1217. ISSN 1562-3599

Yoon, S; Weidner, T and Hastak, M (2021) Erratum: Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution (journal of construction engineering and management DOI: 10.1061/(ASCE)CO.1943-7862.0001956). Journal of Construction Engineering and Management, 147(7): 08221001, ISSN 0733-9364

Yoon, S; Weidner, T and Hastak, M (2021) Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution. Journal of Construction Engineering and Management, 147(3): 04020185, ISSN 0733-9364

Assaad, R; El-Adaway, I H; Hastak, M and Needy, K L (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. Journal of Construction Engineering and Management, 146(12): 05020019, ISSN 0733-9364

Yoon, S; Hastak, M and Lee, J (2018) Suitability of intelligent compaction for asphalt pavement quality control and quality assurance. Journal of Construction Engineering and Management, 144(4): 04018006, ISSN 0733-9364

Yoon, S; Kang, K; Yoon, Y; Hastak, M and Ji, R (2018) Systematic decision-making process for composite pavement maintenance. Journal of Construction Engineering and Management, 144(6): 04018044, ISSN 0733-9364

Khallaf, R; Naderpajouh, N and Hastak, M (2018) A systematic approach to develop risk registry frameworks for complex projects. Built Environment Project and Asset Management, 8(4), pp. 334-347. ISSN 2044-124X

Yoon, Y; Patel, S; Ji, R and Hastak, M (2017) Current state of reflective cracking in the United States. Journal of Construction Engineering and Management, 143(3): 04016099, ISSN 0733-9364

Mukhopadhyay, S; Halligan, J and Hastak, M (2016) Assessment of major causes: Nuclear power plant disasters since 1950. International Journal of Disaster Resilience in the Built Environment, 7(5), pp. 521-543. ISSN 1759-5916

Oh, E H; Naderpajouh, N; Hastak, M and Gokhale, S (2016) Integration of the construction knowledge and expertise in front-end planning. Journal of Construction Engineering and Management, 142(2): 04015067, ISSN 0733-9364

Naderpajouh, N; Hastak, M; Gokhale, S; Bayraktar, M E; Iyer, A and Arif, F (2015) Counterfeiting risk governance in the capital projects supply chain. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Naderpajouh, N; Mahdavi, A; Hastak, M and Aldrich, D P (2014) Modeling social opposition to infrastructure development. Journal of Construction Engineering and Management, 140(8): 04014029, ISSN 0733-9364

Naderpajouh, N and Hastak, M (2014) Quantitative analysis of policies for governance of emergent dynamics in complex construction projects. Construction Management and Economics, 32(12), pp. 1222-1237. ISSN 01446193

Cho, K and Hastak, M (2013) Time and cost-optimized decision support model for fast-track projects. Journal of Construction Engineering and Management, 139(1), pp. 90-101. ISSN 0733-9364

Patel, S and Hastak, M (2013) A framework to construct post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 95-114. ISSN 1759-5916

Tamer, Z; Yoon, Y and Hastak, M (2012) Protocol for profitability analysis using internal entities in organizational structure of construction companies. Journal of Construction Engineering and Management, 138(12), pp. 1394-1402. ISSN 0733-9364

Bayraktar, M E; Hastak, M; Gokhale, S and Safi, B (2011) Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects. Journal of Construction Engineering and Management, 137(9), pp. 645-655. ISSN 0733-9364

Deshmukh, A; Oh, E H and Hastak, M (2011) Impact of flood damaged critical infrastructure on communities and industries. Built Environment Project and Asset Management, 1(2), pp. 156-175. ISSN 2044-124X

Oh, E H; Deshmukh, A and Hastak, M (2010) Disaster impact analysis based on inter-relationship of critical infrastructure and associated industries: A winter flood disaster event. International Journal of Disaster Resilience in the Built Environment, 1(1), pp. 25-49. ISSN 1759-5916

Bayraktar, M E and Hastak, M (2010) Scoring approach to construction bond underwriting. Journal of Construction Engineering and Management, 136(9), pp. 957-967. ISSN 0733-9364

Cui, Q; Hastak, M and Halpin, D (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(4), pp. 361-376. ISSN 1466433X

Bayraktar, M E and Hastak, M (2009) Bayesian belief network model for decision making in highway maintenance: Case studies. Journal of Construction Engineering and Management, 135(12), pp. 1357-1369. ISSN 0733-9364

Jeong, J G; Hastak, M and Syal, M (2009) Framework of manufacturer-retailer relationship in the manufactured housing construction. Construction Innovation, 9(1), pp. 22-41. ISSN 1471-4175

Sabharwal, A; Syal, M and Hastak, M (2009) Impact of manufactured housing component assembly redesign on facility layout and production process. Construction Innovation, 9(1), pp. 58-71. ISSN 1471-4175

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364

Cui, Q; Johnson, P; Quick, A and Hastak, M (2008) Valuing the warranty ceiling clause on New Mexico Highway 44 using a binomial lattice model. Journal of Construction Engineering and Management, 134(1), pp. 10-17. ISSN 0733-9364

Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364

Bayraktar, M E; Cui, Q; Hastak, M and Minkarah, I (2006) Warranty bonds from the perspective of surety companies. Journal of Construction Engineering and Management, 132(4), pp. 333-337. ISSN 0733-9364

Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364

Hastak, M; Halpin, D W and Vanegas, J (1996) COMPASS: new paradigm for project cost control strategy and planning. Journal of Construction Engineering and Management, 122(3), pp. 254-264. ISSN 0733-9364

Hastak, M; Vanegas, J A and Puyana-Camargo, M (1993) Time-based competition: Competitive advantage tool for A/E/C firms. Journal of Construction Engineering and Management, 119(4), pp. 785-800. ISSN 0733-9364

Thesis

Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.

This list was generated on Sat Aug 22 01:11:30 2026 UTC.