Items where Author is "Hanna, A S"
Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988
Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364
Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364
Hanna, A S; Iskandar, K A and Lotfallah, W (2019) Benchmarking project performance: A guideline for assessing vulnerability of mechanical and electrical projects to productivity loss. Construction Management and Economics, 37(2), pp. 101-111. ISSN 01446193
Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988
Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364
Hanna, A S; Mikhail, G and Iskandar, K A (2017) State of prefab practice in the electrical construction industry: Qualitative assessment. Journal of Construction Engineering and Management, 143(2): 04016097, ISSN 0733-9364
Hanna, A S (2016) Benchmark performance metrics for integrated project delivery. Journal of Construction Engineering and Management, 142(9): 04016040, ISSN 0733-9364
El Asmar, M; Hanna, A S and Loh, W Y (2016) Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 04015046, ISSN 0733-9364
Hanna, A S; Ibrahim, M W; Lotfallah, W; Iskandar, K A and Russell, J S (2016) Modeling project manager competency: An integrated mathematical approach. Journal of Construction Engineering and Management, 142(8): 4016029, ISSN 0733-9364
Hanna, A S; Lotfallah, W; Aoun, D G and Asmar, M E (2014) Mathematical formulation of the project quarterback rating: New framework to assess construction project performance. Journal of Construction Engineering and Management, 140(8): 04014033, ISSN 0733-9364
Hanna, A S; Yeutter, M and Aoun, D G (2014) State of practice of building information modeling in the electrical construction industry. Journal of Construction Engineering and Management, 140(12): 05014011, ISSN 0733-9364
Hanna, A S; Thomas, G and Swanson, J R (2013) Construction risk identification and allocation: Cooperative approach. Journal of Construction Engineering and Management, 139(9), pp. 1098-1107. ISSN 0733-9364
El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364
Hanna, A S; Tadt, E J and Whited, G C (2012) Request for information: Benchmarks and metrics for major highway projects. Journal of Construction Engineering and Management, 138(12), pp. 1347-1352. ISSN 0733-9364
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364
Hanna, A S and Skiffington, M A (2010) Effect of preconstruction planning effort on sheet metal project performance. Journal of Construction Engineering and Management, 136(2), pp. 235-241. ISSN 0733-9364
El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364
El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364
Karlsson, M; Lakka, A; Sulankivi, K; Hanna, A S and Thompson, B P (2008) Best practices for integrating the concurrent engineering environment into multipartner project management. Journal of Construction Engineering and Management, 134(4), pp. 289-299. ISSN 0733-9364
Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193
Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364
Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364
Chang, C K; Hanna, A S; Lackney, J A and Sullivan, K T (2007) Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor. Journal of Construction Engineering and Management, 133(4), pp. 287-296. ISSN 0733-9364
Menches, C L and Hanna, A S (2006) Conceptual planning process for electrical construction. Journal of Construction Engineering and Management, 132(12), pp. 1306-1313. ISSN 0733-9364
Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364
Hanna, A S; Menches, C L; Sullivan, K T and Sargent, J R (2005) Factors affecting absenteeism in electrical construction. Journal of Construction Engineering and Management, 131(11), pp. 1212-1218. ISSN 0733-9364
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364
Ammar, A; Hanna, A S; Nordheim, E V and Russell, J S (2003) Indicator variables model of firm's size-profitability relationship of electrical contractors using financial and economic data. Journal of Construction Engineering and Management, 129(2), pp. 192-197. ISSN 0733-9364
Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364
Hanna, A S; Camlic, R; Peterson, P A and Nordheim, E V (2002) Quantitative definition of projects impacted by change orders. Journal of Construction Engineering and Management, 128(1), pp. 57-64. ISSN 0733-9364
Kumar, V S S; Hanna, A S and Adams, T (2000) Assessment of working capital requirements by fuzzy set theory. Engineering, Construction and Architectural Management, 7(1), pp. 93-103. ISSN 0969-9988
Hanna, A S; Russell, J S; Nordheim, E V and Bruggink, M J (1999) Impact of change orders on labor efficiency for electrical construction. Journal of Construction Engineering and Management, 125(4), pp. 224-232. ISSN 0733-9364
Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364
Hanna, A S; Russell, J S and Vandenberg, P J (1999) The impact of change orders on mechanical construction labour efficiency. Construction Management and Economics, 17(6), pp. 721-730. ISSN 01446193
Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: The impact on labour. Construction Management and Economics, 16(1), pp. 79-90. ISSN 01446193
Noyce, D A and Hanna, A S (1997) Planned schedule compression concept file for electrical contractors. Journal of Construction Engineering and Management, 123(2), pp. 189-197. ISSN 0733-9364
Hanna, A S and Senouci, A B (1995) Design optimization of concrete-slab forms. Journal of Construction Engineering and Management, 121(2), pp. 215-221. ISSN 0733-9364
Hanna, A S; Willenbrock, J H and Sanvido, V E (1992) Knowledge acquisition and development for formwork selection system. Journal of Construction Engineering and Management, 118(1), pp. 179-198. ISSN 0733-9364
Hanna, A S (1989) An interactive knowledge-based formwork selection system for buildings. PhD thesis, Pennsylvania State University, USA.