Items where Author is "Gidado, K"

Group by: Item Type | No Grouping
Number of items: 22.

Article

Han, Y; Yin, Z; Liu, J; Jin, R; Gidado, K; Painting, N; Yang, Y and Yan, L (2019) Defining and testing a safety cognition framework incorporating safety hazard perception. Journal of Construction Engineering and Management, 145(12): 04019081, ISSN 0733-9364

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(1), pp. 87-106. ISSN 1609-9451

Gidado, K and Barter, G (1996) The constraints to effective information flow in the construction management procurement system. Journal of Construction Procurement, 2(2), pp. 52-68. ISSN 1358-9180

Thesis

Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.

Conference Paper

Alaqad, M; Gidado, K; Piroozfar, P; Alkhadim, M and Dorgham, A (2020) Efficacy of value management system in building projects: A UK perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Alaqad, M; Gidado, K and Piroozfar, P (2015) Integrating value, risk and environmental management at the strategic definition stage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Marantzidis, I and Gidado, K (2011) The maximisation of the use of reclaimed asphalt pavement (RAP) in the Greek construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Elnaas, H; Ashton, P and Gidado, K (2009) Decision making process for using off-site manufacturing systems for housing projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ahmed, A and Gidado, K (2008) Evaluating the potential of renewable energy technologies for buildings in Nigeria. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Wood, H L and Gidado, K (2008) An overview of complexity theory and its application to the construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rutter, D and Gidado, K (2005) PFI projects: Their scope for delivering vfm. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Painting, N; Ashton, P and Gidado, K (2004) PFI in south aast England secondary schools: A school manager's perspective. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Rutter, D and Gidado, K (2004) Value for money and facilities performance: A systems approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Liang, X; Gidado, K and Painting, N (2004) The identification of key obstacles that hinder foreign private finance investments in highway projects in China. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ashton, P and Gidado, K (2004) The practical application of a site investigation risk evaluation system. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Ashton, P and Gidado, K (2003) The development of a project and site investigation risk evaluation model. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Akerele, D and Gidado, K (2003) The risks and constraints in the implementation of PFI/PPP in Nigeria. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Ashton, P and Gidado, K (2002) The identification of uncertainty and risk associated with inadequate site investigation procedures relative to project complexity. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Ashton, P and Gidado, K (2001) Risk associated with inadequate site investigation procedures under design and build procurement systems. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Gidado, K (2000) Flowcharted model for information flow in design and build projects. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

This list was generated on Sat Aug 22 01:18:05 2026 UTC.