Items where Author is "Feng, C W"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 2.

Article

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Liu, L; Burns, S A and Feng, C W (1995) Construction time-cost trade-off analysis using LP/IP hybrid method. Journal of Construction Engineering and Management, 121(4), pp. 446-454. ISSN 0733-9364

This list was generated on Sat Aug 22 01:15:03 2026 UTC.