Items where Author is "Fayek, A R"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 27.

Article

Gebretekle, Y T and Fayek, A R (2023) Fuzzy agent-based modeling of competency and performance measures in construction. Journal of Construction Engineering and Management, 149(12): 04023133, ISSN 0733-9364

Fayek, A R and Golabchi, A (2022) Framework for identification of performance metrics for research and development collaborations: Construction innovation centre. Built Environment Project and Asset Management, 12(5), pp. 837-852. ISSN 2044-124X

Tiruneh, G G and Fayek, A R (2022) Hybrid GA-manfis model for organizational competencies and performance in construction. Journal of Construction Engineering and Management, 148(4): 04022002, ISSN 0733-9364

Raoufi, M and Fayek, A R (2021) How to improve crew motivation and performance on construction sites. Journal of Construction Engineering and Management, 147(9): 02521001, ISSN 0733-9364

Raoufi, M and Fayek, A R (2021) Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. Construction Innovation, 21(3), pp. 398-416. ISSN 1471-4175

Raoufi, M and Fayek, A R (2020) Fuzzy Monte Carlo agent-based simulation of construction crew performance. Journal of Construction Engineering and Management, 146(5): 04020041, ISSN 0733-9364

Fayek, A R (2020) Fuzzy logic and fuzzy hybrid techniques for construction engineering and management. Journal of Construction Engineering and Management, 146(7): 04020064, ISSN 0733-9364

Monzer, N; Fayek, A R; Lourenzutti, R and Siraj, N B (2019) Aggregation-based framework for construction risk assessment with heterogeneous groups of experts. Journal of Construction Engineering and Management, 145(3): 04019003, ISSN 0733-9364

Siraj, N B and Fayek, A R (2019) Risk identification and common risks in construction: Literature review and content analysis. Journal of Construction Engineering and Management, 145(9): 03119004, ISSN 0733-9364

Gerami Seresht, N and Fayek, A R (2018) Dynamic modeling of multifactor construction productivity for equipment-intensive activities. Journal of Construction Engineering and Management, 144(9): 04018091, ISSN 0733-9364

Raoufi, M and Fayek, A R (2018) Framework for identification of factors affecting construction crew motivation and performance. Journal of Construction Engineering and Management, 144(9): 04018080, ISSN 0733-9364

Raoufi, M and Fayek, A R (2018) Key moderators of the relationship between construction crew motivation and performance. Journal of Construction Engineering and Management, 144(6): 04018047, ISSN 0733-9364

Tsehayae, A A and Fayek, A R (2016) Developing and optimizing context-specific fuzzy inference system-based construction labor productivity models. Journal of Construction Engineering and Management, 142(7): 4016017, ISSN 0733-9364

Elbarkouky, M M G; Fayek, A R; Siraj, N B and Sadeghi, N (2016) Fuzzy arithmetic risk analysis approach to determine construction project contingency. Journal of Construction Engineering and Management, 142(12): 04016070, ISSN 0733-9364

Tsehayae, A A and Fayek, A R (2016) System model for analysing construction labour productivity. Construction Innovation, 16(2), pp. 203-228. ISSN 1471-4175

Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364

Awad, A and Fayek, A R (2013) Adaptive learning of contractor default prediction model for surety bonding. Journal of Construction Engineering and Management, 139(6), pp. 694-704. ISSN 0733-9364

Abdelgawad, M A M and Fayek, A R (2012) Comprehensive hybrid framework for risk analysis in the construction industry using combined failure mode and effect analysis, fault trees, event trees, and fuzzy logic. Journal of Construction Engineering and Management, 138(5), pp. 642-651. ISSN 0733-9364

Abdelgawad, M A M and Fayek, A R (2011) Fuzzy reliability analyzer: Quantitative assessment of risk events in the construction industry using fuzzy fault-tree analysis. Journal of Construction Engineering and Management, 137(4), pp. 294-302. ISSN 0733-9364

Elbarkouky, M M G and Fayek, A R (2011) Fuzzy similarity consensus model for early alignment of construction project teams on the extent of their roles and responsibilities. Journal of Construction Engineering and Management, 137(6), pp. 432-440. ISSN 0733-9364

Abdelgawad, M A M and Fayek, A R (2010) Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Management, 136(9), pp. 1028-1036. ISSN 0733-9364

Marsh, K and Fayek, A R (2010) SuretyAssist: Fuzzy expert system to assist surety underwriters in evaluating construction contractors for bonding. Journal of Construction Engineering and Management, 136(11), pp. 1219-1226. ISSN 0733-9364

Poveda, C A and Fayek, A R (2009) Predicting and evaluating construction trades foremen performance: Fuzzy logic approach. Journal of Construction Engineering and Management, 135(9), pp. 920-929. ISSN 0733-9364

Shaheen, A A; Fayek, A R and Abourizk, S M (2007) Fuzzy numbers in cost range estimating. Journal of Construction Engineering and Management, 133(4), pp. 325-334. ISSN 0733-9364

Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364

Fayek, A R and Oduba, A (2005) Predicting industrial construction labor productivity using fuzzy expert systems. Journal of Construction Engineering and Management, 131(8), pp. 938-941. ISSN 0733-9364

Knight, K and Fayek, A R (2002) Use of fuzzy logic for predicting design cost overruns on building projects. Journal of Construction Engineering and Management, 128(6), pp. 503-512. ISSN 0733-9364

This list was generated on Sat Aug 22 01:19:32 2026 UTC.