Items where Author is "Emsley, M W"
Article
Lowe, D J; Emsley, M W and Harding, A (2007) Relationships between total construction cost and design related variables. Journal of Financial Management of Property and Construction, 12(1), pp. 11-24. ISSN 1366-4387
Lowe, D J; Emsley, M W and Harding, A (2006) Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp. 750-758. ISSN 0733-9364
Lowe, D J; Emsley, M W and Harding, A (2006) Relationships between total construction cost and project strategic, site related and building definition variable. Journal of Financial Management of Property and Construction, 11(3), pp. 165-180. ISSN 1366-4387
Lowe, D J; Parvar, J and Emsley, M W (2004) Development of a decision support system (DSS) for the contractor's decision to bid: Regression analysis and neural networks solutions. Journal of Financial Management of Property and Construction, 9(1), pp. 27-42. ISSN 1366-4387
Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193
Thesis
Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.
Up a level