Items where Author is "Elbeltagi, E"
Article
Allam, A; Elbeltagi, E; Abouelsaad, M N and E. El Madawy, M (2026) Integrated BIM-GA approach for slab formwork design optimization. Construction Innovation, 26(2), pp. 631-651. ISSN 1471-4175
Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988
Elnabwy, M T; Khalaf, D; Mlybari, E A and Elbeltagi, E (2025) An integrated machine learning approach for evaluating critical success factors influencing project portfolio management adoption in the construction industry. Engineering, Construction and Architectural Management, 32(11), pp. 7449-7468. ISSN 0969-9988
Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599
Shaker, R A; Elbeltagi, E; Motawa, I; Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(4), pp. 607-625. ISSN 2044-124X
Evans, M; Farrell, P; Elbeltagi, E and Dion, H (2023) Barriers to integrating lean construction and integrated project delivery (IPD) on construction megaprojects towards the global integrated delivery (gid) in multinational organisations: Lean IPD&gid transformative initiatives. Journal of Engineering, Design and Technology, 21(3), pp. 778-818. ISSN 1726-0531
Mashali, A; Elbeltagi, E; Motawa, I and Elshikh, M (2023) Stakeholder management challenges in mega construction projects: Critical success factors. Journal of Engineering, Design and Technology, 21(2), pp. 358-375. ISSN 1726-0531
Elmasoudi, I; Ibrahim, M G; Tokimatsu, K and Elbeltagi, E (2022) Environmental impact assessment model for buildings' construction activities. International Journal of Construction Management, 22(5), pp. 849-860. ISSN 1562-3599
Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364
Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988
Elbeltagi, E; Hosny, O A; Elhakeem, A; Abd-Elrazek, M E and Abdullah, A (2011) Selection of slab formwork system using fuzzy logic. Construction Management and Economics, 29(7), pp. 659-670. ISSN 1466433X
Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364
Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193
Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364
Up a level