Items where Author is "El Asmar, M"

Group by: Item Type | No Grouping
Number of items: 18.

Demetracopoulou, V; O'Brien, W J; Khwaja, N; Feghaly, J and El Asmar, M (2024) A critical review and analysis of decision-support processes and tools for project delivery method selection. Engineering, Construction and Architectural Management, 31(1), pp. 487-505. ISSN 0969-9988

Gibson, G E; El Asmar, M; Yussef, A and Ramsey, D (2024) A novel approach for measuring the accuracy of front end engineering design. Engineering, Construction and Architectural Management, 31(7), pp. 2669-2696. ISSN 0969-9988

Aramali, V; Gibson, G E; El Asmar, M and Sanboskani, H (2023) Novel earned value management system maturity framework and its relation to project performance. Journal of Construction Engineering and Management, 149(6): 04023031, ISSN 0733-9364

Gibson, G E; Sanboskani, H; El Asmar, M and Aramali, V (2022) Employing technology to enable remote research charrettes as a method for engaging industry and uncovering best practices: A novel approach for a post-COVID-19 world. Journal of Construction Engineering and Management, 148(11): 04022122, ISSN 0733-9364

Franz, B; Leicht, R; El Asmar, M and Molenaar, K (2022) Methodological consistency for quantitative analysis and reporting in project delivery system performance research. Journal of Construction Engineering and Management, 148(9): 04022080, ISSN 0733-9364

Feghaly, J; El Asmar, M; Ariaratnam, S and Bearup, W (2020) Selecting project delivery methods for water treatment plants. Engineering, Construction and Architectural Management, 27(4), pp. 936-951. ISSN 0969-9988

Bingham, E; Edward Gibson, G and El Asmar, M (2019) Identifying team selection and alignment factors by delivery method for transportation projects. Journal of Construction Engineering and Management, 145(10): 04019061, ISSN 0733-9364

Hamzeh, F; Rached, F; Hraoui, Y; Karam, A J; Malaeb, Z; El Asmar, M and Abbas, Y (2019) Integrated project delivery as an enabler for collaboration: A middle East perspective. Built Environment Project and Asset Management, 9(3), pp. 334-347. ISSN 2044-124X

Burke, R D; Parrish, K and El Asmar, M (2018) Environmental product declarations: Use in the architectural and engineering design process to support sustainable construction. Journal of Construction Engineering and Management, 144(5): 04018026, ISSN 0733-9364

Vashani, H; Sullivan, J and El Asmar, M (2016) DB 2020: Analyzing and forecasting design-build market trends. Journal of Construction Engineering and Management, 142(6): 04016008, ISSN 0733-9364

El Asmar, M; Hanna, A S and Loh, W Y (2016) Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 04015046, ISSN 0733-9364

Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364

Francom, T C and El Asmar, M (2015) Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate analyses. Journal of Construction Engineering and Management, 141(9): 4015028, ISSN 0733-9364

El Asmar, M; Hanna, A S and Loh, W Y (2013) Quantifying performance for the integrated project delivery system as compared to established delivery systems. Journal of Construction Engineering and Management, 139(11): 4013012, ISSN 0733-9364

Hanna, A; Boodai, F and El Asmar, M (2013) State of practice of building information modeling in mechanical and electrical construction industries. Journal of Construction Engineering and Management, 139(10): 04013009, ISSN 0733-9364

El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system. PhD thesis, University of Wisconsin - Madison, USA.

El Asmar, M; Lotfallah, W; Whited, G and Hanna, A S (2010) Quantitative methods for design-build team selection. Journal of Construction Engineering and Management, 136(8), pp. 904-912. ISSN 0733-9364

El Asmar, M; Hanna, A S and Chang, C K (2009) Monte Carlo simulation approach to support alliance team selection. Journal of Construction Engineering and Management, 135(10), pp. 1087-1095. ISSN 0733-9364

This list was generated on Sat Aug 22 01:14:45 2026 UTC.