Items where Author is "El-Rayes, K"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 44.

Article

Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364

Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364

Alashari, M; El-Rayes, K and Alotaibi, M (2023) Optimizing the planning of maintenance activities in education buildings. Journal of Construction Engineering and Management, 149(10): 04023094, ISSN 0733-9364

Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599

Almashaqbeh, M and El-Rayes, K (2022) Minimizing transportation cost of prefabricated modules in modular construction projects. Engineering, Construction and Architectural Management, 29(10), pp. 3847-3867. ISSN 0969-9988

Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364

Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364

Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988

Perez-Perez, Y; Golparvar-Fard, M and El-Rayes, K (2021) Scan2bim-net: Deep learning method for segmentation of point clouds for scan-to-BIM. Journal of Construction Engineering and Management, 147(9): 04021107, ISSN 0733-9364

Halabya, A and El-Rayes, K (2020) Optimizing the planning of pedestrian facilities upgrade projects to maximize accessibility for people with disabilities. Journal of Construction Engineering and Management, 146(1): 04019088, ISSN 0733-9364

Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193

Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364

Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364

Abdallah, M A A; El-Rayes, K and Liu, L (2016) Minimizing upgrade cost to achieve LEED certification for existing buildings. Journal of Construction Engineering and Management, 142(2): 04015073, ISSN 0733-9364

Abdelmohsen, A Z and El-Rayes, K (2016) Optimal trade-offs between construction cost and traffic delay for highway work zones. Journal of Construction Engineering and Management, 142(7): 5016004, ISSN 0733-9364

Karatas, A and El-Rayes, K (2014) Optimal trade-offs between social quality of life and life-cycle cost in housing units. Journal of Construction Engineering and Management, 140(12): 04014058, ISSN 0733-9364

Orabi, W and El-Rayes, K (2012) Optimizing the rehabilitation efforts of aging transportation networks. Journal of Construction Engineering and Management, 138(4), pp. 529-539. ISSN 0733-9364

Elghamrawy, T; El-Rayes, K; Liu, L and Odeh, I (2012) Performance of temporary rumble strips at the edge of highway construction zones. Journal of Construction Engineering and Management, 138(8), pp. 923-930. ISSN 0733-9364

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Hassan, M M; Odeh, I and El-Rayes, K (2011) New approach to compare glare and light characteristics of conventional and balloon lighting systems. Journal of Construction Engineering and Management, 137(1), pp. 39-44. ISSN 0733-9364

Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364

El-Anwar, O; El-Rayes, K and Elnashai, A S (2010) Maximizing the sustainability of integrated housing recovery efforts. Journal of Construction Engineering and Management, 136(7), pp. 794-802. ISSN 0733-9364

Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364

Orabi, W; El-Rayes, K; Senouci, A B and Al-Derham, H (2009) Optimizing postdisaster reconstruction planning for damaged transportation networks. Journal of Construction Engineering and Management, 135(10), pp. 1039-1048. ISSN 0733-9364

El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364

Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364

Khalafallah, A and El-Rayes, K (2008) Minimizing construction-related security risks during airport expansion projects. Journal of Construction Engineering and Management, 134(1), pp. 40-48. ISSN 0733-9364

Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X

Hyari, K and El-Rayes, K (2006) Lighting requirements for nighttime highway construction. Journal of Construction Engineering and Management, 132(5), pp. 435-443. ISSN 0733-9364

Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364

Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364

Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364

El-Rayes, K and Hyari, K (2005) Optimal lighting arrangements for nighttime highway construction projects. Journal of Construction Engineering and Management, 131(12), pp. 1292-1300. ISSN 0733-9364

El-Rayes, K and Kandil, A (2005) Time-cost-quality trade-off analysis for highway construction. Journal of Construction Engineering and Management, 131(4), pp. 477-486. ISSN 0733-9364

El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364

El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193

El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364

El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364

El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364

El-Rayes, K (2001) Optimum planning of highway construction under A+B bidding method. Journal of Construction Engineering and Management, 127(4), pp. 261-269. ISSN 0733-9364

El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193