Items where Author is "Eirgash, M A"
Group by: Item Type | No Grouping
Jump to: Article
Number of items: 1.
Article
Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364
Up a level