Items where Author is "Eaton, D"

Group by: Item Type | No Grouping
Number of items: 13.

Article

Sundaraj, G and Eaton, D (2013) Quantifying robustness in PFIs. Journal of Financial Management of Property and Construction, 18(1), pp. 26-52. ISSN 1366-4387

Beran, V; Dlask, P; Eaton, D; Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(2), pp. 190-211. ISSN 1471-4175

Pellicer, T M; Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(6), pp. 573-597. ISSN 0969-9988

El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175

Eaton, D; Akbiyikli, R; de Lemos, T; Gunnigan, L; Ozen Kutanis, R; Casensky, M; Ladra, J and el Sawalhi, N (2007) An examination of the suitability of a UK PFI model within the Czech Republic, the Republic of Ireland, Palestine (Gaza-West bank), Portugal and Turkey. Construction Innovation, 7(1), pp. 122-142. ISSN 1471-4175

Eaton, D; Akbiyikli, R and Dickinson, M (2006) An evaluation of the stimulants and impediments to innovation within PFI/PPP projects. Construction Innovation, 6(2), pp. 63-67. ISSN 1471-4175

de Lemos, T; Almeida, L; Betts, M and Eaton, D (2003) An examination on the sustainable competitive advantage of private finance initiative projects. Construction Innovation, 3(4), pp. 249-259. ISSN 1471-4175

Eaton, D (2001) A temporal typology for innovation within the construction industry. Construction Innovation, 1(3), pp. 165-179. ISSN 1471-4175

Thesis

Eaton, D (2000) A phenomenologically based contingent anatomy of competitive advantage within the construction industry. PhD thesis, University of Salford, UK.

Conference Paper

Sundaraj, G and Eaton, D (2011) The anticipated robustness factors in a PFI project environment from the granting authority s perspective. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Eaton, D and Morton, P (2008) A minority report: Engaging girls in quantity surveying. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Akbiyikli, R and Eaton, D (2006) Operation and maintenance (O&M) management in PFI road projects in the UK. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

This list was generated on Sat Aug 22 01:14:47 2026 UTC.