Items where Author is "Duff, A R"

Group by: Item Type | No Grouping
Number of items: 12.

Article

Cameron, I; Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(4), pp. 363-374. ISSN 0969-9988

Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193

Suraji, A; Duff, A R and Peckitt, S J (2001) Development of causal model of construction accident causation. Journal of Construction Engineering and Management, 127(4), pp. 337-344. ISSN 0733-9364

Davey, C L; Lowe, D J and Duff, A R (2001) Generating opportunities for SMEs to develop partnerships and improve performance. Building Research & Information, 29(1), pp. 1-11. ISSN 0961-3218

Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218

Duff, A R; Robertson, I T; Phillips, R A and Cooper, M D (1994) Improving safety by the modification of behaviour. Construction Management and Economics, 12(1), pp. 67-78. ISSN 01446193

Duff, A R (1987) Interference in stochastic flow-line models. Journal of Construction Engineering and Management, 113(3), pp. 385-398. ISSN 0733-9364

Duff, A R (1980) A stochastic analysis of activity duration. Construction Papers, 1(1), pp. 63-69. ISSN 0144-8587

Conference Paper

Suraji, A and Duff, A R (2000) Construction management actions: A stimulant of construction accident causation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Parvar, J; Lowe, D; Emsley, M and Duff, A R (2000) Neural networks as a decision support system for the decision to bid process. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Duff, A R; Emsley, M; Gregory, M; Lowe, D and Masterman, J (1998) Development of a model of total building procurement costs for construction clients. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

This list was generated on Sat Aug 22 01:13:55 2026 UTC.