Items where Author is "Chua, D K H"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 23.

Article

Yeoh, J K W and Chua, D K H (2017) Optimizing crane selection and location for multistage construction using a four-dimensional set cover approach. Journal of Construction Engineering and Management, 143(8): 04017029, ISSN 0733-9364

Attarzadeh, M; Chua, D K H; Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), pp. 676-692. ISSN 0144-6193

Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364

Song, Y and Chua, D K H (2011) Requirement and availability time-window analysis of intermediate function. Journal of Construction Engineering and Management, 137(11), pp. 967-975. ISSN 0733-9364

Goh, Y M and Chua, D K H (2010) Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization. Journal of Construction Engineering and Management, 136(2), pp. 170-178. ISSN 0733-9364

Chua, D K H; Yeoh, K W and Song, Y (2010) Quantification of spatial temporal congestion in four-dimensional computer-aided design. Journal of Construction Engineering and Management, 136(6), pp. 641-649. ISSN 0733-9364

Goh, Y M and Chua, D K H (2009) Case-based reasoning for construction hazard identification: Case representation and retrieval. Journal of Construction Engineering and Management, 135(11), pp. 1181-1189. ISSN 0733-9364

Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364

Song, Y and Chua, D K H (2006) Modeling of functional construction requirements for constructability analysis. Journal of Construction Engineering and Management, 132(12), pp. 1314-1326. ISSN 0733-9364

Chua, D K H and Godinot, M (2006) Use of a WBS matrix to improve interface management in projects. Journal of Construction Engineering and Management, 132(1), pp. 67-79. ISSN 0733-9364

Chan, W T; Chen, C; Messner, J I and Chua, D K H (2005) Interface management for China's build-operate-transfer projects. Journal of Construction Engineering and Management, 131(6), pp. 645-655. ISSN 0733-9364

Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364

Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364

Chua, D K H and Goh, Y M (2004) Incident causation model for improving feedback of safety knowledge. Journal of Construction Engineering and Management, 130(4), pp. 542-551. ISSN 0733-9364

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Chua, D K H; Wang, Y and Tan, W T (2003) Impacts of obstacles in East Asian cross-border construction. Journal of Construction Engineering and Management, 129(2), pp. 131-141. ISSN 0733-9364

Chua, D K H; Tyagi, A; Ling, S and Bok, S H (2003) Process-parameter-interface model for design management. Journal of Construction Engineering and Management, 129(6), pp. 653-663. ISSN 0733-9364

Chua, D K H and Li, G M (2002) RISim: Resource-interacted simulation modeling in construction. Journal of Construction Engineering and Management, 128(3), pp. 195-202. ISSN 0733-9364

Chua, D K H; Li, D Z and Chan, W T (2001) Case-based reasoning approach in bid decision making. Journal of Construction Engineering and Management, 127(1), pp. 35-45. ISSN 0733-9364

Chua, D K H and Li, D (2000) Key factors in bid reasoning model. Journal of Construction Engineering and Management, 126(5), pp. 349-357. ISSN 0733-9364

Chua, D K H; Kog, Y C and Loh, P K (1999) Critical success factors for different project objectives. Journal of Construction Engineering and Management, 125(3), pp. 142-150. ISSN 0733-9364

Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364

Chan, W T; Chua, D K H and Kannan, G (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), pp. 125-132. ISSN 0733-9364

This list was generated on Sun Aug 23 01:33:54 2026 UTC.