Items where Author is "Cheung, S O"
Article
Cheung, S O and Ma, Q (2026) Economic incentives and psychological empowerment in construction contracting: Complementing or undermining. Journal of Construction Engineering and Management, 152(4): 04026022, ISSN 0733-9364
Ma, Q and Cheung, S O (2025) Augmenting the incentivizing power of target cost contracting in integrated project delivery. Journal of Construction Engineering and Management, 151(7): 04025069, ISSN 0733-9364
Ma, Q; Cheung, S O and Li, S (2025) Managing risks in IPD-ish projects: Experience from Hong Kong. Engineering, Construction and Architectural Management, 32(3), pp. 1816-1836. ISSN 0969-9988
Lin, S and Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4): 04025015, ISSN 0733-9364
Cao, N and Cheung, S O (2025) The value of voluntary participation in construction dispute mediation. Engineering, Construction and Architectural Management, 32(2), pp. 1229-1253. ISSN 0969-9988
Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(6): 04024046, ISSN 0733-9364
Ma, Q; Cheung, S O and Li, S (2023) Optimum risk/reward sharing framework to incentivize integrated project delivery adoption. Construction Management and Economics, 41(6), pp. 519-535. ISSN 01446193
Zhu, L and Cheung, S O (2022) Equity gap in construction contracting: Identification and ramifications. Engineering, Construction and Architectural Management, 29(1), pp. 262-286. ISSN 0969-9988
Lin, S and Cheung, S O (2022) Exploring the concept of psychological distance and its impact on intention to settle in construction dispute negotiation. Journal of Construction Engineering and Management, 148(12): 04022133, ISSN 0733-9364
Lin, S and Cheung, S O (2022) Intention to settle as an indispensable element of negotiated construction dispute settlement. Journal of Construction Engineering and Management, 148(10): 04022113, ISSN 0733-9364
Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364
Cheung, S O; Zhu, L and Yu, K I (2022) The value of apology in construction dispute negotiation. International Journal of Construction Management, 22(10), pp. 1910-1923. ISSN 1562-3599
Lee, C K; Yiu, T W and Cheung, S O (2021) Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model. International Journal of Construction Management, 21(1), pp. 27-40. ISSN 1562-3599
Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364
Zhu, L; Cheung, S O; Gao, X; Li, Q and Liu, G (2020) Success DNA of a record-breaking megaproject. Journal of Construction Engineering and Management, 146(8): 05020009, ISSN 0733-9364
Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(2), pp. 321-348. ISSN 0969-9988
Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364
Shen, L and Cheung, S O (2018) How forming joint ventures may affect market concentration in construction industry? International Journal of Construction Management, 18(2), pp. 151-162. ISSN 1562-3599
Cheung, S O; Levina, B and Niu, Y (2017) Concentration analysis of new private residential units market in Hong Kong. Construction Economics and Building, 17(2), pp. 1-23. ISSN 2204-9029
Cheung, S O and Pang, K H Y (2013) Anatomy of construction disputes. Journal of Construction Engineering and Management, 139(1), pp. 15-23. ISSN 0733-9364
Cheung, S O; Yiu, T W and Lam, M C (2013) Interweaving trust and communication with project performance. Journal of Construction Engineering and Management, 139(8), pp. 941-950. ISSN 0733-9364
Yiu, T W; Cheung, S O and Siu, L Y (2012) Application of bandura's self-efficacy theory to examining the choice of tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 138(3), pp. 331-340. ISSN 0733-9364
Chow, P T; Kong, F and Cheung, S O (2012) Mediating and moderating effect of tension on withdrawal-commitment relationship in construction dispute negotiation. Journal of Construction Engineering and Management, 138(10), pp. 1230-1238. ISSN 0733-9364
Cheung, S O and Chow, P T (2011) Withdrawal in construction project dispute negotiation. Journal of Construction Engineering and Management, 137(12), pp. 1071-1079. ISSN 0733-9364
Love, P; Davis, P; Ellis, J and Cheung, S O (2010) Dispute causation: Identification of pathogenic influences in construction. Engineering, Construction and Architectural Management, 17(4), pp. 404-423. ISSN 0969-9988
Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364
Cheung, S O; Chow, P T and Yiu, T W (2009) Contingent use of negotiators' tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 135(6), pp. 466-476. ISSN 0733-9364
Wong, P S P; Cheung, S O and Fan, K L (2009) Examining the relationship between organizational learning styles and project performance. Journal of Construction Engineering and Management, 135(6), pp. 497-507. ISSN 0733-9364
Cheung, S O; Yiu, T W; Leung, A Y T and Chiu, O K (2008) Catastrophic transitions of construction contracting behavior. Journal of Construction Engineering and Management, 134(12), pp. 942-952. ISSN 0733-9364
Wong, P S P; Cheung, S O and Hardcastle, C (2007) Embodying learning effect in performance prediction. Journal of Construction Engineering and Management, 133(6), pp. 474-482. ISSN 0733-9364
Tam, V W Y; Tam, C M; Yiu, K T W and Cheung, S O (2006) Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Construction Management and Economics, 24(11), pp. 1113-1123. ISSN 1466433X
Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364
Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364
Wong, P S P; Cheung, S O and Ho, P K M (2005) Contractor as trust initiator in construction partnering: prisoner's dilemma perspective. Journal of Construction Engineering and Management, 131(10), pp. 1045-1053. ISSN 0733-9364
Leung, M Y; Ng, S T; Skitmore, M and Cheung, S O (2005) Critical stressors influencing construction estimators in Hong Kong. Construction Management and Economics, 23(1), pp. 33-44. ISSN 01446193
Cheung, S O; Yiu, K T W and Suen, H (2004) Construction negotiation online. Journal of Construction Engineering and Management, 130(6), pp. 844-852. ISSN 0733-9364
Leung, M Y; Ng, S T and Cheung, S O (2004) Measuring construction project participant satisfaction. Construction Management and Economics, 22(3), pp. 319-331. ISSN 01446193
Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193
Cheung, S O; Tam, C M; Tam, V; Cheung, K and Suen, H (2004) A web-based performance assessment system for environmental protection: Wepass. Construction Management and Economics, 22(9), pp. 927-935. ISSN 01446193
Lam, K C; Cheung, S O; Tang, C M and Ng, S T (2002) Capital budgeting evaluation practices of building contractors in Hong Kong. Construction Economics and Building, 2(1), pp. 81-93. ISSN 2204-9029
Cheung, S O; Suen, H C H and Lam, T I (2002) Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5), pp. 409-417. ISSN 0733-9364
Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193
Chan, A P C; Yung, E H K; Lam, P T I; Tam, C M and Cheung, S O (2001) Application of Delphi method in selection of procurement systems for construction projects. Construction Management and Economics, 19(7), pp. 699-718. ISSN 01446193
Lam, K C; Runeson, G; Ng, S T; Hu, T S; Cheung, S O and Deng, Z M (2001) Capital budget planning practices of building contractors in Hong Kong. Construction Management and Economics, 19(6), pp. 569-576. ISSN 01446193
Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364
Tam, C M; Tong, T K L; Cheung, S O and Chan, A P C (2001) Genetic algorithm model in optimizing the use of labour. Construction Management and Economics, 19(2), pp. 207-215. ISSN 01446193
Lam, K C; Hu, T; Cheung, S O; Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: Non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(2), pp. 130-144. ISSN 0969-9988
Cheung, S O; Ng, S T; Lam, K C and Sin, W S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(2), pp. 117-127. ISSN 1471-4175
Lam, K C; So, A T P; Hu, T; Ng, T; Yuen, R K K; Lo, S M; Cheung, S O and Yang, H (2001) An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Construction Management and Economics, 19(1), pp. 63-76. ISSN 01446193
Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988
Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193
Conference Paper
Li, K and Cheung, S O (2016) The potential of bias in multi-tier construction dispute resolution processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Wong, P S P and Cheung, S O (2005) From monitoring to learning: A conceptual framework. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Wong, P S P; Cheung, S O and Chan, L L Y (2004) Enhancing construction value chain effectiveness in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Lam, G T W; Cheung, S O and Ng, S T (1999) The effectiveness of design and build conditions of contract. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Cheung, S O and Tsang, K F (1997) Professional liabilities in construction: Exposures and responses. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Up a level