Items where Author is "Boussabaine, A H"
Article
Vakili-Ardebili, A and Boussabaine, A H (2010) Ecological building design determinants. Architectural Engineering and Design Management, 6(2), pp. 111-131. ISSN 1745-2007
Vakili-Ardebili, A and Boussabaine, A H (2007) Creating value through sustainable building design. Architectural Engineering and Design Management, 3(2), pp. 83-92. ISSN 1745-2007
Kirkham, R J and Boussabaine, A H (2005) Forecasting the residual service life of nhs hospital buildings: A stochastic approach. Construction Management and Economics, 23(5), pp. 521-529. ISSN 01446193
Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), pp. 1011-1020. ISSN 01446193
Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193
Elhag, T M S and Boussabaine, A H (2002) Tender price estimation using artificial neural networks II: Modelling. Journal of Financial Management of Property and Construction, 7(1), pp. 49-64. ISSN 1366-4387
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration I: Principles. Engineering, Construction and Architectural Management, 8(2), pp. 104-113. ISSN 0969-9988
Boussabaine, A H (2001) Neurofuzzy modelling of construction projects' duration ii: Application. Engineering, Construction and Architectural Management, 8(2), pp. 114-129. ISSN 0969-9988
Elhag, T M S and Boussabaine, A H (2001) Tender price estimation using artificial neural networks. Journal of Financial Management of Property and Construction, 6(3), pp. 193-208. ISSN 1366-4387
Wanous, M; Boussabaine, A H and Lewis, J (2000) To bid or not to bid: A parametric solution. Construction Management and Economics, 18(4), pp. 457-466. ISSN 01446193
Boussabaine, A H and Elhag, T (1999) Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17(6), pp. 745-755. ISSN 01446193
Boussabaine, A H; Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(3), pp. 213-224. ISSN 0969-9988
Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(2), pp. 141-158. ISSN 1358-9180
Boussabaine, A H and Kaka, A P (1998) A neural networks approach for cost flow forecasting. Construction Management and Economics, 16(4), pp. 471-479. ISSN 01446193
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218
Conference Paper
Alzaed, A and Boussabaine, A H (2012) A conceptual model for user-centred passive building design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Yahya, K and Boussabaine, A H (2004) Developing a framework for assessing eco-costs of construction site activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kirkham, R J and Boussabaine, A H (2001) Modelling probability distributions of facilities management costs for an NHS acute care hospital building. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kirkham, R J and Boussabaine, A H (2000) Developing a framework for whole of life costing in the national health service estate. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Boussabaine, A H and Elhag, T M S (1999) Knowledge discovery in residential construction project cost data. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Wanous, M; Boussabaine, A H and Lewis, J (1999) A qualitative bidding model. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Wanous, M; Boussabaine, A H and Lewis, J (1998) Tendering factors considered by Syrian contractors. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Elhag, T M S and Boussabaine, A H (1998) An artificial neural system for cost estimation of construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Up a level