Items where Author is "Bernold, L E"

Group by: Item Type | No Grouping
Jump to: Article | Thesis
Number of items: 33.

Article

Moon, S; Zekavat, P R and Bernold, L E (2017) Dynamic quality control of process resource to improve concrete supply chain. Journal of Construction Engineering and Management, 143(5): 04016130, ISSN 0733-9364

Din, Z U and Bernold, L E (2017) Experimental study of signal behavior for wireless communication in construction. Construction Innovation, 17(4), pp. 475-491. ISSN 1471-4175

Moon, S; Zekavat, P R and Bernold, L E (2015) Dynamic control of construction supply chain to improve labor performance. Journal of Construction Engineering and Management, 141(6): 05015002, ISSN 0733-9364

Bernold, L E and Lee, T S (2010) Experimental research in construction. Journal of Construction Engineering and Management, 136(1), pp. 26-35. ISSN 0733-9364

Bernold, L E (2007) Quantitative assessment of backhoe operator skill. Journal of Construction Engineering and Management, 133(11), pp. 889-899. ISSN 0733-9364

Bernold, L E (2007) Teaching evaluations for construction engineering and management: Opportunity to move us forward. Journal of Construction Engineering and Management, 133(2), pp. 146-156. ISSN 0733-9364

Nuntasunti, S and Bernold, L E (2006) Experimental assessment of wireless construction technologies. Journal of Construction Engineering and Management, 132(9), pp. 1009-1018. ISSN 0733-9364

Kolera, B T and Bernold, L E (2006) Intelligent utility locating tool for excavators. Journal of Construction Engineering and Management, 132(9), pp. 919-927. ISSN 0733-9364

Bernold, L E (2005) Automatic as-built generation with utility trenchers. Journal of Construction Engineering and Management, 131(6), pp. 740-747. ISSN 0733-9364

Bernold, L E (2005) Paradigm shift in construction education is vital for the future of our profession. Journal of Construction Engineering and Management, 131(5), pp. 533-539. ISSN 0733-9364

Harper, D G and Bernold, L E (2005) Success of supplier alliances for capital projects. Journal of Construction Engineering and Management, 131(9), pp. 979-985. ISSN 0733-9364

Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364

Lee, J; Lorenc, S J and Bernold, L E (2003) Comparative performance evaluation of tele-operated pipe laying. Journal of Construction Engineering and Management, 129(1), pp. 32-40. ISSN 0733-9364

Bernold, L E (2003) Economic model to optimize underground utility protection. Journal of Construction Engineering and Management, 129(6), pp. 645-652. ISSN 0733-9364

Bernold, L E (2002) Spatial integration in construction. Journal of Construction Engineering and Management, 128(5), pp. 400-408. ISSN 0733-9364

Bai, Y and Bernold, L E (2001) Quality control parameters for robotic bridge painting. Journal of Construction Engineering and Management, 127(2), pp. 142-148. ISSN 0733-9364

Bernold, L E; Lorenc, S J and Davis, M L (2001) Technological intervention to eliminate back injury risks for nailing. Journal of Construction Engineering and Management, 127(3), pp. 245-250. ISSN 0733-9364

Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364

Moon, S and Bernold, L E (1998) Graphic-based human-machine interface for construction manipulator control. Journal of Construction Engineering and Management, 124(4), pp. 305-314. ISSN 0733-9364

Huang, X and Bernold, L E (1997) CAD-integrated excavation and pipe laying. Journal of Construction Engineering and Management, 123(3), pp. 318-323. ISSN 0733-9364

Bernold, L E; Lorenc, S J and Luces, E (1997) Intelligent technology for truck crane accident prevention. Journal of Construction Engineering and Management, 123(3), pp. 276-284. ISSN 0733-9364

Huang, X; Bernd, D and Bernold, L E (1996) Innovative technology development for safe excavation. Journal of Construction Engineering and Management, 122(1), pp. 91-96. ISSN 0733-9364

Salim, M D and Bernold, L E (1994) Effects of design-integrated process planning on productivity in rebar placement. Journal of Construction Engineering and Management, 120(4), pp. 720-738. ISSN 0733-9364

Gavilan, R M and Bernold, L E (1994) Source evaluation of solid waste in building construction. Journal of Construction Engineering and Management, 120(3), pp. 536-552. ISSN 0733-9364

Bernold, L E and Guler, N (1993) Analysis of back injuries in construction. Journal of Construction Engineering and Management, 119(3), pp. 607-621. ISSN 0733-9364

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364

Bernold, L E and Chang, P (1992) Potential gains through welded-wire fabric reinforcement. Journal of Construction Engineering and Management, 118(2), pp. 244-257. ISSN 0733-9364

Miller, M L and Bernold, L E (1991) Sensor-integrated nailing for building construction. Journal of Construction Engineering and Management, 117(2), pp. 213-225. ISSN 0733-9364

Bernold, L E and Treseler, J F (1991) Vendor analysis for best buy in construction. Journal of Construction Engineering and Management, 117(4), pp. 645-658. ISSN 0733-9364

Bernold, L E (1990) Testing bar-code technology in construction environment. Journal of Construction Engineering and Management, 116(4), pp. 643-655. ISSN 0733-9364

Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364

Thesis

Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.

This list was generated on Sat Aug 22 01:15:44 2026 UTC.