Items where Author is "Berawi, M A"
Berawi, M A; Sari, M; Oktaviani, A D; Miraj, P; Susantono, B and Woodhead, R (2025) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. International Journal of Construction Management, 25(6), pp. 650-660. ISSN 1562-3599
Berawi, M A; Kim, A A; Naomi, F; Basten, V; Miraj, P; Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(3), pp. 410-422. ISSN 1562-3599
Berawi, M A; Miraj, P; Arifuddin, R; Aulia, D and Rahma, S H (2022) Investigating current practice on disincentive programmes in the Indonesian construction industry. Journal of Construction in Developing Countries, 27(2), pp. 87-107. ISSN 1823-6499
Miraj, P; Berawi, M A and Utami, S R (2021) Economic feasibility of green office building: Combining life cycle cost analysis and cost–benefit evaluation. Building Research & Information, 49(6), pp. 624-638. ISSN 0961-3218
Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X
Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364
Up a level