Items where Author is "Ballard, G"
Salazar, L A; Ballard, G; Arroyo, P and Alarcón, L F (2022) Development of a commitment management system for construction projects. Journal of Construction Engineering and Management, 148(12): 05022012, ISSN 0733-9364
Lerche, J; Neve, H H; Ballard, G; Teizer, J; Wandahl, S and Gross, A (2020) Application of last planner system to modular offshore wind construction. Journal of Construction Engineering and Management, 146(11): 05020015, ISSN 0733-9364
Arroyo, P; Tommelein, I D and Ballard, G (2016) Selecting globally sustainable materials: A case study using choosing by advantages. Journal of Construction Engineering and Management, 142(2): 05015015, ISSN 0733-9364
de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007
Arroyo, P; Tommelein, I D and Ballard, G (2015) Comparing AHP and CBA as decision methods to resolve the choosing problem in detailed design. Journal of Construction Engineering and Management, 141(1): 04014063, ISSN 0733-9364
Koskela, L and Ballard, G (2012) Is production outside management? Building Research & Information, 40(6), pp. 724-737. ISSN 0961-3218
Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X
Pasquire, C; Ballard, G; Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(1), pp. 64-72. ISSN 1366-4387
Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364
Pasquire, C; Ballard, G; Darrington, J W and Howell, G A (2011) Motivation and incentives in relational contracts. Journal of Financial Management of Property and Construction, 16(1), pp. 42-51. ISSN 1366-4387
Pasquire, C; Pennanen, A; Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(1), pp. 52-63. ISSN 1366-4387
Pasquire, C; Ballard, G; Bildsten, L; Björnfot, A and Sandberg, E (2011) Value-driven purchasing of kitchen cabinets in industrialised housing. Journal of Financial Management of Property and Construction, 16(1), pp. 73-83. ISSN 1366-4387
Polat, G; Arditi, D; Ballard, G and Mungen, U (2006) Economics of on-site vs off-site fabrication of rebar. Construction Management and Economics, 24(11), pp. 1185-1198. ISSN 1466433X
Koskela, L and Ballard, G (2006) Should project management be based on theories of economics or production? Building Research & Information, 34(2), pp. 154-163. ISSN 0961-3218
Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193
Ballard, G and Howell, G A (2003) Lean project management. Building Research & Information, 31(2), pp. 119-133. ISSN 0961-3218
Ballard, G; Harper, N and Zabelle, T (2003) Learning to see work flow: An application of lean concepts to precast concrete fabrication. Engineering, Construction and Architectural Management, 10(1), pp. 6-14. ISSN 0969-9988
Whelton, M G and Ballard, G (2002) Decriptive design study: A building facility renewal planning study. Journal of Construction Research, 3(1), pp. 17-33. ISSN 1609-9451
Kim, Y W and Ballard, G (2002) Earned value method and customer earned value. Journal of Construction Research, 3(1), pp. 55-66. ISSN 1609-9451
Ballard, G (2002) Managing work flow on design projects: A case study. Engineering, Construction and Architectural Management, 9(3), pp. 284-291. ISSN 0969-9988
Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451
Gil, N; Tommelein, I D; Kirkendall, R L and Ballard, G (2001) Leveraging specialty-contractor knowledge in design-build organizations. Engineering, Construction and Architectural Management, 8(5-6), pp. 355-367. ISSN 0969-9988
Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364
Ballard, G and Howell, G (1998) Shielding production: Essential step in production control. Journal of Construction Engineering and Management, 124(1), pp. 11-17. ISSN 0733-9364
Kartarn, S; Ballard, G and Ibbs, C W (1997) Introducing a new concept and approach to modeling construction. Journal of Construction Engineering and Management, 123(1), pp. 89-97. ISSN 0733-9364
Howell, G; Laufer, A and Ballard, G (1993) Interaction between subcycles: One key to improved methods. Journal of Construction Engineering and Management, 119(4), pp. 714-728. ISSN 0733-9364