Items where Author is "Ashuri, B"

Group by: Item Type | No Grouping
Jump to: Article
Number of items: 24.

Article

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y; Ashuri, B; Chen, J and Cao, J (2025) Assessing the implementation and effectiveness of China's social credit system of the construction industry: a case study of Nanjing. International Journal of Construction Management, 25(7), pp. 850-859. ISSN 1562-3599

Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364

Li, M; Zheng, Q and Ashuri, B (2024) Application of artificial intelligence in design automation: A two-stage framework for structure configuration and design. Journal of Construction Engineering and Management, 150(8): 04024083, ISSN 0733-9364

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Wang, J; Li, X; Memari, A; Skitmore, M; Zhong, Y and Ashuri, B (2023) Data-driven assessment on the corporate credit scoring mechanism for Chinese construction supervision companies. Construction Management and Economics, 41(11-12), pp. 961-975. ISSN 01446193

Liang, Y and Ashuri, B (2022) Challenges and enabling features of small and medium infrastructure public-private partnerships (p3s): A case study of the US P3 infrastructure market. Engineering, Construction and Architectural Management, 29(1), pp. 49-71. ISSN 0969-9988

Li, M; Baek, M and Ashuri, B (2021) Forecasting ratio of low bid to owner's estimate for highway construction. Journal of Construction Engineering and Management, 147(1): 04020157, ISSN 0733-9364

Liang, Y; Ashuri, B and Li, M (2021) Forecasting the construction expenditure cash flow for transportation design-build projects with a case-based reasoning model. Journal of Construction Engineering and Management, 147(6): 04021043, ISSN 0733-9364

Li, M and Ashuri, B (2021) Proportional cox hazards model to quantify the likelihood of underestimation in transportation projects. Journal of Construction Engineering and Management, 147(10): 04021134, ISSN 0733-9364

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Jallan, Y and Ashuri, B (2020) Text mining of the securities and exchange commission financial filings of publicly traded construction firms using deep learning to identify and assess risk. Journal of Construction Engineering and Management, 146(12): 04020137, ISSN 0733-9364

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Ashuri, B; Wang, J; Shahandashti, M and Baek, M (2019) A data envelopment analysis (DEA) model for building energy benchmarking. Journal of Engineering, Design and Technology, 17(4), pp. 747-768. ISSN 1726-0531

Shahandashti, M; Ashuri, B and Mostaan, K (2018) Automatic fault detection for building integrated photovoltaic (BIPV) systems using time series methods. Built Environment Project and Asset Management, 8(2), pp. 160-170. ISSN 2044-124X

Abediniangerabi, B; Shahandashti, S M; Ahmadi, N and Ashuri, B (2017) Empirical investigation of temporal association between architecture billings index and construction spending using time-series methods. Journal of Construction Engineering and Management, 143(10): 04017080, ISSN 0733-9364

Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771

Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364

Kashani, H; Ashuri, B; Shahandashti, S M and Lu, J (2015) Investment valuation model for renewable energy systems in buildings. Journal of Construction Engineering and Management, 141(2): 04014074, ISSN 0733-9364

Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364

Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X

Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364

Ashuri, B; Kashani, H; Molenaar, K R; Lee, S and Lu, J (2012) Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management, 138(4), pp. 545-557. ISSN 0733-9364

Ashuri, B; Lu, J and Kashani, H (2011) A real options framework to evaluate investments in toll road projects delivered under the two-phase development strategy. Built Environment Project and Asset Management, 1(1), pp. 14-31. ISSN 2044-124X

Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364

This list was generated on Sat Aug 22 01:20:07 2026 UTC.