Items where Author is "Arashpour, M"
Article
Gunarathna, C; Yang, R J; Jayasuriya, S; Yi, X; Arashpour, M; Ning, X and Heng, X (2026) Design and development of blockchain-enabled information management system for building integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(15), pp. 72-114. ISSN 0969-9988
Sandagomika, H; Bazli, M and Arashpour, M (2026) Quantifying embodied carbon reductions through mixed reality integration in prefabrication: A Monte Carlo-enhanced life cycle approach. Journal of Construction Engineering and Management, 152(5): 04026051, ISSN 0733-9364
Gutierrez-Bucheli, L; Goh, J T; Rashidi, A; Maxwell, D; Digby, R; Fang, Y; Pook, H and Arashpour, M (2025) Adopting immersive technologies in construction training: Determining educational decision-making criteria through a Delphi technique. Smart and Sustainable Built Environment, 14(5), pp. 1434-1458. ISSN 2046-6099
Hassan Ali, A; Farouk Kineber, A; Elshaboury, N; Arashpour, M and Osama Daoud, A (2025) Analysing multifaceted barriers to modular construction in sustainable building projects: a comprehensive evaluation using multi-criteria decision making. International Journal of Construction Management, 25(1), pp. 1-17. ISSN 1562-3599
Abu Alieh, L; Hosseini, M R; Martek, I; Wu, W and Arashpour, M (2025) Bridging the gap: assessing the person-organization fit between BIM education and industry expectations in Australia. Engineering, Construction and Architectural Management, 32(6), pp. 3760-3778. ISSN 0969-9988
Mohandes, S R; Singh, A K; Fazeli, A; Banihashemi, S; Arashpour, M; Cheung, C; Ejohwomu, O and Zayed, T (2025) Determining the stationary digital twins implementation barriers for sustainable construction projects. Smart and Sustainable Built Environment, 14(5), pp. 1538-1563. ISSN 2046-6099
Gurmu, A; Hosseini, M R; Arashpour, M and Lioeng, W (2025) Development of building defects dashboards and stochastic models for multi-storey buildings in Victoria, Australia. Construction Innovation, 25(2), pp. 594-619. ISSN 1471-4175
Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Xia, X; Xiang, P; Khanmohammadi, S; Gao, T and Arashpour, M (2024) Predicting safety accident costs in construction projects using ensemble data-driven models. Journal of Construction Engineering and Management, 150(7): 04024054, ISSN 0733-9364
Kineber, A F; Ali, A H; Elshaboury, N; Oke, A E and Arashpour, M (2024) A multi-criteria evaluation and stationary analysis of value management implementation barriers for sustainable residential building projects. International Journal of Construction Management, 24(2), pp. 199-212. ISSN 1562-3599
Mirzaee, A M; Hosseini, M R; Martek, I; Rahnamayiezekavat, P and Arashpour, M (2023) Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: Case studies from Iran. Engineering, Construction and Architectural Management, 30(4), pp. 1481-1495. ISSN 0969-9988
Goodarzizad, P; Mohammadi Golafshani, E and Arashpour, M (2023) Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm. International Journal of Construction Management, 23(5), pp. 763-779. ISSN 1562-3599
Lee, Y S; Rashidi, A; Talei, A; Arashpour, M and Pour Rahimian, F (2022) Integration of deep learning and extended reality technologies in construction engineering and management: A mixed review method. Construction Innovation, 22(3), pp. 671-701. ISSN 1471-4175
Nasirian, A; Abbasi, B; Cheng, T C E and Arashpour, M (2022) Multiskilled workforce planning: A case from the construction industry. Journal of Construction Engineering and Management, 148(5): 04022021, ISSN 0733-9364
Zhao, Y; Chen, W; Arashpour, M; Yang, Z; Shao, C and Li, C (2022) Predicting delays in prefabricated projects: Sd-bp neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753-1776. ISSN 0969-9988
Alkaissy, M; Arashpour, M; Zeynalian, M and Li, H (2022) Worksite accident impacts on construction and infrastructure: Nondeterministic analysis of subsectors and organization sizes. Journal of Construction Engineering and Management, 148(6): 04022023, ISSN 0733-9364
Durdyev, S; Hosseini, M R; Martek, I; Ismail, S and Arashpour, M (2020) Barriers to the use of integrated project delivery (IPD): A quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(1), pp. 186-204. ISSN 0969-9988
Arashpour, M; Heidarpour, A; Akbar Nezhad, A; Hosseinifard, Z; Chileshe, N and Hosseini, R (2020) Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality. Construction Management and Economics, 38(6), pp. 502-514. ISSN 01446193
Nasirian, A; Arashpour, M and Abbasi, B (2019) Critical literature review of labor multiskilling in construction. Journal of Construction Engineering and Management, 145(1): 04018113, ISSN 0733-9364
Innella, F; Arashpour, M and Bai, Y (2019) Lean methodologies and techniques for modular construction: Chronological and critical review. Journal of Construction Engineering and Management, 145(12): 04019076, ISSN 0733-9364
Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364
Nasirian, A; Arashpour, M; Abbasi, B; Zavadskas, E K and Akbarnezhad, A (2019) Skill set configuration in prefabricated construction: Hybrid optimization and multicriteria decision-making approach. Journal of Construction Engineering and Management, 145(9): 04019050, ISSN 0733-9364
Hosseini, M R; Maghrebi, M; Akbarnezhad, A; Martek, I and Arashpour, M (2018) Analysis of citation networks in building information modeling research. Journal of Construction Engineering and Management, 144(8): 04018064, ISSN 0733-9364
Hosseini, M R; Martek, I; Chileshe, N; Zavadskas, E K and Arashpour, M (2018) Assessing the influence of virtuality on the effectiveness of engineering project networks: "Big five theory" perspective. Journal of Construction Engineering and Management, 144(7): 04018059, ISSN 0733-9364
Arashpour, M; Wakefield, R; Abbasi, B; Arashpour, M and Hosseini, R (2018) Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources. Architectural Engineering and Design Management, 14(1-2), pp. 46-59. ISSN 1745-2007
Hosseini, M R; Martek, I; Papadonikolaki, E; Sheikhkhoshkar, M; Banihashemi, S and Arashpour, M (2018) Viability of the BIM manager enduring as a distinct role: Association rule mining of job advertisements. Journal of Construction Engineering and Management, 144(9): 04018085, ISSN 0733-9364
Yang, R J; Jayasuriya, S; Gunarathna, C; Arashpour, M; Xue, X and Zhang, G (2018) The evolution of stakeholder management practices in Australian mega construction projects. Engineering, Construction and Architectural Management, 25(6), pp. 690-706. ISSN 0969-9988
Hosseini, M R; Bosch-Sijtsema, P; Arashpour, M; Chileshe, N and Merschbrock, C (2018) A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams. Construction Innovation, 18(1), pp. 109-131. ISSN 1471-4175
Nikmehr, B; Hosseini, M R; Rameezdeen, R; Chileshe, N; Ghoddousi, P and Arashpour, M (2017) An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management, 24(6), pp. 1246-1268. ISSN 0969-9988
Hosseini, M R; Chileshe, N; Jepson, J and Arashpour, M (2016) Critical success factors for implementing risk management systems in developing countries. Construction Economics and Building, 16(1), pp. 18-32. ISSN 2204-9029
Mignone, G; Hosseini, M R; Chileshe, N and Arashpour, M (2016) Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: A case study of the New Royal Adelaide Hospital. Architectural Engineering and Design Management, 12(5), pp. 333-352. ISSN 1745-2007
Arashpour, M; Wakefield, R; Blismas, N and Abbasi, B (2016) Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects. Journal of Construction Engineering and Management, 142(1): 05015012, ISSN 0733-9364
Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364
Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2013) A new approach for modelling variability in residential construction projects. Construction Economics and Building, 13(2), pp. 83-92. ISSN 2204-9029
Arashpour, M; Shabanikia, M and Arashpour, M (2012) Valuing the contribution of knowledge-oriented workers to projects: A merit based approach in the construction industry. Construction Economics and Building, 12(4), pp. 1-12. ISSN 2204-9029
Conference Paper
Hosseini, M H; Aibinu, A; Chileshe, N and Arashpour, M (2017) Eleven years of arcom: Bibliometric mapping of studies published between 2005 and 2016. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Up a level