Items where Author is "Aibinu, A A"

Group by: Item Type | No Grouping
Number of items: 20.

Article

Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175

Oliveros-Romero, J and Aibinu, A A (2023) Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: A toll road case. Built Environment Project and Asset Management, 13(4), pp. 574-589. ISSN 2044-124X

Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193

Aibinu, A A; Carter, S; Francis, V and Vaz-Serra, P (2020) Request for information frequency and their turnaround time in construction projects: A data-analytic study. Built Environment Project and Asset Management, 10(1), pp. 1-15. ISSN 2044-124X

Oliveros-Romero, J and Aibinu, A A (2019) Ex post impact evaluation of PPP projects: An exploratory research. Built Environment Project and Asset Management, 9(2), pp. 315-330. ISSN 2044-124X

Shrestha, A; Chan, T K; Aibinu, A A; Chen, C and Martek, I (2018) Risk allocation inefficiencies in Chinese PPP water projects. Journal of Construction Engineering and Management, 144(4): 04018013, ISSN 0733-9364

Gurmu, A T and Aibinu, A A (2017) Construction equipment management practices for improving labor productivity in multistory building construction projects. Journal of Construction Engineering and Management, 143(10): 04017081, ISSN 0733-9364

Ahmad, T and Aibinu, A A (2017) Project delivery attributes influencing green building project outcomes: A review and future research directions. Built Environment Project and Asset Management, 7(5), pp. 471-489. ISSN 2044-124X

Shrestha, A; Chan, T K; Aibinu, A A; Chen, C and Martek, I (2017) Risks in PPP water projects in China: Perspective of local governments. Journal of Construction Engineering and Management, 143(7): 05017006, ISSN 0733-9364

Fageha, M K and Aibinu, A A (2016) Identifying stakeholders' involvement that enhances project scope definition completeness in Saudi Arabian public building projects. Built Environment Project and Asset Management, 6(1), pp. 6-29. ISSN 2044-124X

Gurmu, A T; Aibinu, A A and Chan, T K (2016) A study of best management practices for enhancing productivity in building projects: Construction methods perspectives. Construction Economics and Building, 16(3), pp. 1-19. ISSN 2204-9029

Aibinu, A A; Dassanayake, D; Chan, T-K and Thangaraj, R (2015) Cost estimation for electric light and power elements during building design: A neural network approach. Engineering, Construction and Architectural Management, 22(2), pp. 190-213. ISSN 0969-9988

Fageha, M K and Aibinu, A A (2014) Prioritising project scope definition elements in public building projects. Construction Economics and Building, 14(3), pp. 18-33. ISSN 2204-9029

Aibinu, A A; Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: Contractors' perspectives. Construction Management and Economics, 29(5), pp. 463-481. ISSN 1466433X

Aibinu, A A; Ofori, G and Ling, F Y Y (2008) Explaining cooperative behavior in building and civil engineering projects' claims process: Interactive effects of outcome favorability and procedural fairness. Journal of Construction Engineering and Management, 134(9), pp. 681-691. ISSN 0733-9364

Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X

Aibinu, A A and Odeyinka, H A (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667-677. ISSN 0733-9364

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193

Conference Paper

Ahmad, T; Aibinu, A A and Stephan, A (2017) Green building projects: Process innovation leading to project innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.