Items where Author is "AbouRizk, S M"
Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988
Song, L and AbouRizk, S M (2005) Quantifying engineering project scope for productivity modeling. Journal of Construction Engineering and Management, 131(3), pp. 360-367. ISSN 0733-9364
Hajjar, D and AbouRizk, S M (2002) Unified modeling methodology for construction simulation. Journal of Construction Engineering and Management, 128(2), pp. 174-185. ISSN 0733-9364
Allouche, E N; Ariaratnam, S T and AbouRizk, S M (2001) Applications of horizontal characterization techniques in trenchless construction. Journal of Construction Engineering and Management, 127(6), pp. 476-484. ISSN 0733-9364
Lu, M and AbouRizk, S M (2000) Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), pp. 219-226. ISSN 0733-9364
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364
Shi, J and AbouRizk, S M (1997) Resource-based modeling for construction simulation. Journal of Construction Engineering and Management, 123(1), pp. 26-33. ISSN 0733-9364
Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364
Up a level