Items where Author is "AbouRizk, S"
Article
Pourrahimian, E; Eltahan, A; Salhab, D; Crawford, J; AbouRizk, S and Hamzeh, F (2026) Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: A machine learning approach. Engineering, Construction and Architectural Management, 33(1), pp. 856-872. ISSN 0969-9988
Wen, H; AbouRizk, S and Mohamed, Y (2025) Gap analysis of digitalization levels in construction and manufacturing: A comparative study of construction 4.0 and industry 4.0. Journal of Construction Engineering and Management, 151(3): 04025001, ISSN 0733-9364
Elkholosy, H; Ead, R; Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(5), pp. 561-572. ISSN 1562-3599
RazaviAlavi, S and AbouRizk, S (2022) A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects. Journal of Engineering, Design and Technology, 20(4), pp. 866-886. ISSN 1726-0531
Moharrami, S; Taghaddos, M; RazaviAlavi, S R and AbouRizk, S (2021) A hybrid simulation approach for microtunneling construction planning. Construction Innovation, 21(3), pp. 363-378. ISSN 1471-4175
Liu, C; AbouRizk, S; Morley, D and Lei, Z (2020) Data-driven simulation-based analytics for heavy equipment life-cycle cost. Journal of Construction Engineering and Management, 146(5): 04020038, ISSN 0733-9364
Farajmandi, M; Ali, M; Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(9), pp. 2615-2641. ISSN 0969-9988
Nassar, N and AbouRizk, S (2016) Introduction to techniques for resolving project performance contradictions. Journal of Construction Engineering and Management, 142(8): 4016027, ISSN 0733-9364
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364
Mohamed, Y and AbouRizk, S (2005) Application of the theory of inventive problem solving in tunnel construction. Journal of Construction Engineering and Management, 131(10), pp. 1099-1108. ISSN 0733-9364
Mohamed, Y and AbouRizk, S (2005) Technical knowledge consolidation using theory of inventive problem solving. Journal of Construction Engineering and Management, 131(9), pp. 993-1001. ISSN 0733-9364
McCabe, B; AbouRizk, S and Gavin, J (2002) Time of sampling strategies for asphalt pavement quality assurance. Journal of Construction Engineering and Management, 128(1), pp. 85-89. ISSN 0733-9364
AbouRizk, S and Mather, K (2000) Simplifying simulation modeling through integration with 3D CAD. Journal of Construction Engineering and Management, 126(6), pp. 475-483. ISSN 0733-9364
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Up a level