Items where Author is "Abdul-Rahman, H"
Loo, S C; Wang, C; Yap, J B H; Abdul-Rahman, H and Wood, L C (2020) Globalisation entry decision-supporting tool for international construction risks. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 151-166. ISSN 17514304
Low, W W; Abdul-Rahman, H and Zakaria, N (2020) Organisational culture of Malaysian international construction organisations. International Journal of Construction Management, 20(2), pp. 105-121. ISSN 1562-3599
Wang, C; Loo, S C; Yap, J B H and Abdul-Rahman, H (2019) Novel capability-based risk assessment calculator for construction contractors venturing overseas. Journal of Construction Engineering and Management, 145(10): 04019059, ISSN 0733-9364
Yap, J B H; Abdul-Rahman, H and Wang, C (2018) Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. Journal of Construction Engineering and Management, 144(5): 4018025, ISSN 0733-9364
Wang, C; Mohd-Rahim, F A; Chan, Y Y and Abdul-Rahman, H (2017) Fuzzy mapping on psychological disorders in construction management. Journal of Construction Engineering and Management, 143(2): 04016094, ISSN 0733-9364
Hong, W T; Abdul-Rahman, H and Wang, C (2016) The application of Form Fchool Feng Shui model in a sleep environment: Human preferences and subjective sleep quality evaluation. Architectural Engineering and Design Management, 12(6), pp. 442-459. ISSN 1745-2007
Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(2), pp. 229-244. ISSN 1471-4175
Al-Sibaie, E Z; Alashwal, A M; Abdul-Rahman, H and Zolkafli, U K (2014) Determining the relationship between conflict factors and performance of international construction projects. Engineering, Construction and Architectural Management, 21(4), pp. 369-382. ISSN 0969-9988
Goh, C S; Abdul-Rahman, H and Abdul Samad, Z (2013) Applying risk management workshop for a public construction project: Case study. Journal of Construction Engineering and Management, 139(5), pp. 572-580. ISSN 0733-9364
Goh, C S and Abdul-Rahman, H (2013) The identification and management of major risks in the Malaysian construction industry. Journal of Construction in Developing Countries, 18(1), pp. 19-32. ISSN 1823-6499
Abdul-Rahman, H; Yahya, I A; Berawi, M A and Wah, L W (2008) Conceptual delay mitigation model using a project learning approach in practice. Construction Management and Economics, 26(1), pp. 15-27. ISSN 1466433X
Abdul-Rahman, H; Berawi, M A; Berawi, A R; Mohamed, O; Othman, M and Yahya, I A (2006) Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management, 132(2), pp. 125-133. ISSN 0733-9364
Abdul-Rahman, H (1996) Some observations on the management of quality among construction professionals in the UK. Construction Management and Economics, 14(6), pp. 485-495. ISSN 01446193
Abdul-Rahman, H (1995) The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), pp. 23-32. ISSN 01446193
Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193
Up a level